Base of operation,  where most jobs’ decisions are made from.

A place to gather and overhaul all working machinery is mandatory under this plan.

Machinery properly fixed and maintained will assure the continuation of duty.

Bids will be fairly done to the best companies and service industries.

Evacuation and allotment will be done following the proper procedures of order and correctness.

Let's change Caracas' face

At this very point the government will have created and designed a place cleverly equipped consigned to be ample-roomed where they will make maintenance to construction machinery and all equipment involved in the plan. We very sadly come from a culture where maintenance is not a custom and therefore expensive vehicles and machineries the government have acquired through the years are wrecked up in a short period of time, stacked and oxidized at any field where they eventually were corroding to become junks due to lack of repair, losing at the same time all the money once invested on that valuable purchase. That is why the urgency and truthful need to build this site to ensure the continued use and operation of the gears equipped with a properly trained and permanent staff to ensure its functionality.
Maintenance must be performed to the machine’s last stage of operability and afterwards they could be sold to private companies or donated to non-profit organizations as done in developed countries, but corrosion of the equipment will never be an option.
Here then is the conclusion of the first phase, the most crucial, essential and challenging segment that if it’s done step by step it will lead to the next ones that together will toughen up this Mother Plan eradicating in a given period of time the menace of one of the most serious problems currently being faced by the country, the proliferation of the slums or the so-called “Rancheríos” or “Favelas”.

 

SECOND PHASE.

On this encouraging and enthusiastic second phase  important data will be obtained on specific activities  regarding to all procurement of materials, staffing, physical size of the housing complexes and operational capacity  (never compared to  former plans of the old INAVI, (Gov.-Agcy.) or any  pre-fabricated construction or pre-existing floor plans) keeping in mind that as in any social interest complex construction a margin of allocation error  can be corrected by increasing the amount of units by a 10% of the whole agenda (a small example would be that for every hundred houses  the margin of error will be corrected by building 110 houses ) which implies that if a large-scale construction is 1000 homes, the real number of houses to build will be 1.100, if  2000 the construction will be 2.200 and so forth. The entire construction of all units together will be called Gross construction. This percentage is highly necessary for being so tangible and accurate.
This margin of error will also be applied to the Displacement Area by endowing ten percent more homes of the number of households counted by the teams of social workers.
This margin of error is always used to house families who for one reason or another were not included in the lists provided, that is why it is always necessary and advisable not to use the 100 % of the gross occupational capacity.
Its more convenient and economical for most of the maneuvers to be done at the base of operations due to its proximity. Operational malleability, handiness of resources and all operating costs fall down dramatically put into effect in this area already established and equipped by the government, which otherwise would have to pay high prices for the drawing of plans and studies on expensive architects offices in rented buildings far away from the area in question. That's why it is imperative the strategic volume of the base, not only as a geographical location but also as a highly gifted spot with capacity to allocate buildings and equipment necessary for the development and full volume of the commitment.

The reports, statistics and calculations will be done from the base of operations, these reports are to be used in similar future procedures and this is the point in which the meetings of engineers and architects in charge will be held from, as well as meetings with government representatives whose tasks and responsibilities are being commanded from higher levels. 

All necessary bids for hired companies must take place there; these companies may be both domestic and overseas depending on the volume and complexity of the work to be developed.
With the second phase completed we will have in hands the developing plans, the companies commissioned to do the jobs, the preparation of the displaced zone, the total completion of the base of operations, and full support of the National Guard and the Army. It is at this stage that it becomes very necessary for the government to maintain a methodical and properly controlled billing process and a highly supervised administration to prevent corruption, unnecessary waste or illicit use of  federal resources.
With this stage being put into effect, let’s get to the subsequent one.

THIRD PHASE.

On this third phase violence and human stubbornness will be handled with care, since most individuals consider their “Ranchos” as their main dwelling spaces and no matter how rough conditions might be,  many of them wish to remain with no intention whatsoever to abandon them despite better conditions may await.
This human pattern confirmed by psychoanalysts is more common in women with young children or elders deeply adapted to their conditions and by no means extreme force or violence will be used, it is understandable however that those are government regulations required to be fulfilled and they need to be enforced not with ferocity but with a proper intelligence procedure described ahead.

On this third phase a previously established team will be on the displacement area properly trained to begin receiving families arriving in accordance to tickets with numbers and color codes given in advance, even if the tickets are lost they will have the data and photos corresponding to every one of them, at this very point it is imperative the permanent presence of the Army and the Police to ensure the order and law compliance.
It is understandable that a large community such as one found in an elevation area  could not be evacuated in a day or perhaps in a week, yet this delay is significantly important as it will improve the quality of the evacuation procedure, avoiding the swirling of people and overpopulation, so that the process could be slowly accomplished step by step and  carried out systematically and safely, group by group, no matter if people arrive early or late it will not alter the allocation already been preset. This will calm down the anxieties of individuals, will ensure a social order and eases the moving process, this procedure may have the use of loudspeakers, led by a delegate staff to align and handle the processing groups.
There are many evacuation procedures one of them is by running numerical colors, it's like watching a town map from above and divide it into square sections, each section will have a different color and every color will be sub-divided into numbers so by the time of the evacuation every group will be called by a colored-number ensuring the proper order of such evacuation.
A small example would be a lost lady carrying a ticket with the number "403-Red", that person will immediately notice that it is not her turn because all the surrounding individuals are holding blue tickets with numbers piled within 700 's  and not within 400 's.

 

 

 

 

 

The fact of being poor does not mean to deserve an unreliable social home.

Better constructions going on in premises.

It’s time for better equipped and endowed homes.

Experienced engineers and architects working of the project plans.

The Handicapped, the elder and the infant are to be treated in special manner while in the moving.

Page 5

READ SOME OTHER PROJECS OF NATIONAL IMPORTANCE. (In English soon).

MOTHER PROJECT "SHANTYTOWNS" (ENGLISH  & SPANISH)

MOTHER PROJECT "WASTE"

(ENGLISH & SPANISH)

MOTHER PROJECT "HOSPITAL" (SPANISH)

  MOTHER PROJECT "CRIME" (SPANISH)

  MOTHER PROJECT "Brazil Shantytowns" (Portuguese)

bottom of page